Introduceți „de unde” și „unde” pentru ca căutarea să funcționeze
primul. următorul.
ultimul.
primul. următorul.
ultimul.

Afișează autobuze, troleibuze și tramvaie prin GPS

Actualizări online în timp real
Suport pentru toate dispozitivele moderne

Serviciul arată locația autobuzelor, troleibuzelor și tramvaielor prin sistemul de poziționare prin satelit GPS/GLONASS. Puteți afla unde se află transportul public și decide când să mergeți la stație.

Google PlayApp Store



1
2
3
4
5
6
7
8
9
0
ascunde
splash
ERR
Notificări despre transport
început - sfârșit / header / cause / effectdescription
-

To accommodate renovations at Providence Station, construction barriers have been installed and the southern stairwell to Track 1 is out of service. Staircase access is available to Track 3 and Track 5.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Affected lines: <br>Foxboro Event Service <br>Providence/Stoughton Line

Tren Providence/Stoughton Line
-

There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway.


UNKNOWN_CAUSEUNKNOWN_EFFECT
There are accessible mini-high platforms at the western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.

Tren Framingham/Worcester Line
-

Littleton/Route 495 passengers can expect occasional traffic and detours when accessing the station due to the Foster Street reconstruction work.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Scheduled to complete sometime in 2027, the reconstruction of Foster Street includes widening and resurfacing, with the addition of bicycle lanes.

Tren Fitchburg Line
-

The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Affected lines: <br>Fall River/New Bedford Line

Tren Fall River/New Bedford Line
-

From March through June, 2026, Wickford Junction Garage will be undergoing renovation. Visitors can expect one level at a time to be inaccessible as crews work to complete each floor.


UNKNOWN_CAUSEOTHER_EFFECT


Tren Providence/Stoughton Line
-

The platform at Jackson Square is undergoing renovations to improve safety and accessibility. Sections of the platform are unlevel, which may make it difficult for some riders to board and exit trains.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Please see station personnel or use a station call box to request assistance.

Metrou Orange Line
-

Courthouse Escalator 415 (Airport/Design Center platform to lobby) unavailable due to ongoing construction at the station.


MAINTENANCENone


Autobuz SL3Autobuz SL2Autobuz SL1
-

Courthouse Escalator 417 (Airport/Design Center platform to south lobby) is unavailable due to ongoing construction at the station.


MAINTENANCENone


Autobuz SL3Autobuz SL2Autobuz SL1
-

Bowdoin Escalator 125 (Lobby to street) is unavailable until further notice, pending replacement.


MAINTENANCENone
The escalator will remain out of service for the foreseeable future. This decision was made after a thorough inspection determined that corrosion on the escalator’s steel truss was so severe that it could not be repaired further and that a complete replacement of the escalator would be required. Replacing the escalator at this location requires a more extended unit meeting modern escalator safety requirements. This longer unit will require significant alteration to the station entrance to meet code requirements. The MBTA has currently begun design work to understand what station upgrades will be needed. <br> <br>Due to these complexities, we expect the escalator will remain out of service for a significant time. We recognize the challenges this poses to our riders, and please know we are working to identify a solution as quickly as possible. In the meantime, Government Center Station, which is fully accessible and serves the Blue Line, is under a quarter-mile from Bowdoin Station.

Metrou Blue Line
-

Andrew Escalator 123 (Ashmont/Braintree platform to busway) is unavailable until further notice, pending replacement.


MAINTENANCENone


Metrou Red Line
-

Oak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable


UNKNOWN_CAUSENone


Tren Haverhill Line
-

State Escalator 6 (Oak Grove platform to Old State House lobby) unavailable


UNKNOWN_CAUSENone


Metrou Orange Line
-

Malden Center Escalator 312 (Street level to Commuter Rail platform) unavailable due to maintenance.


MAINTENANCENone


Tren Haverhill Line
-

The bus stop at Brookline Ave @ Longwood Ave (outbound) has moved due to construction. Please board buses at Brookline Ave @ Deaconess Rd.


CONSTRUCTIONSTOP_MOVED
Affected routes: <br>60 <br>65

Autobuz 60Autobuz 65
-

The stairway connecting the Jackson Square lobby and the south end of the platform is closed until winter 2026. Use the stairway at the north end of the platform. This closure is for the construction of a new stairway and a second elevator.


CONSTRUCTIONUNKNOWN_EFFECT
Please see station personnel or use a station call box to request assistance.

Metrou Orange Line
-

Route 429 outbound is detoured due to construction, skipping Oxford St @ Washington St & Oxford St @ Market St. The closest outbound stops with service are Lynn Station & Market St @ Liberty St.


CONSTRUCTIONDETOUR


Autobuz 429
-

Lynn Parking Garage is partially closed, but has sufficient parking capacity to accommodate daily demand.


UNKNOWN_CAUSEOTHER_EFFECT


Autobuz 426Autobuz 456Autobuz 429Autobuz 435Autobuz 439Autobuz 436Autobuz 455Autobuz 442Autobuz 441
-

The bus stop at Massachusetts Ave @ Wendell St (outbound) has moved about 100 feet south, from 7 AM - 4 PM on weekdays until further notice, due to construction.


UNKNOWN_CAUSESTOP_MOVED
Affected routes: <br>77 <br>96

Autobuz 96Autobuz 77
-

Winchester Center Elevator 749 (Track 1 (outbound platform) to Main St) unavailable


UNKNOWN_CAUSENone
Please use nearby ramp to the platform.

Tren Lowell Line
-

Hingham/Hull Ferry: Portions of the Town of Hull parking lot at the Hull ferry terminal are blocked off for sewer pump station construction work. More information is available at https://www.town.hull.ma.us/


UNKNOWN_CAUSEOTHER_EFFECT


Aquabus Hingham Ferry
-

Hingham Ferry Parking Notice: Passengers should allow for extra time to park and to access the ferry in Hingham due to work being done for the new dock. In addition, Route 220 buses are bypassing the shipyard and are remaining on Route 3A.


UNKNOWN_CAUSEOTHER_EFFECT
Pedestrian Access: <br>There is no access between the Hingham Ferry Terminal and DCR building. Pedestrian access to and from the ferry dock is through and around the west side of the Hingham Ferry Terminal. Some sidewalk access at the Terminal may also be restricted during this work. <br> <br>Shipyard Drive: <br>Shipyard Drive is closed to traffic in front of the Hingham Ferry Terminal. Traffic is being rerouted through the Hingham Parking lot. Drop-offs and pick-ups have been relocated to the parking lot. Traffic police and signage will be in place to direct traffic.

Aquabus Hingham/Hull Ferry
-

Lynn Elevators 929 (Street to parking garage) and 930 (Street to parking garage) are unavailable until further notice. Please use the accessible parking spaces on the ground level of the garage while the elevators are out of service.


MAINTENANCENone


Autobuz 426Autobuz 456Autobuz 429Autobuz 435Autobuz 439Autobuz 436Autobuz 455Autobuz 442Autobuz 441
-

Route 556 inbound is detoured, skipping Hammond St @ Plympton St due to maintenance. The closest stops with service are 184 Hammond St & Hammond St @ Lawrence St.


MAINTENANCEDETOUR


Autobuz 556
-

Andrew Escalator 124 (Ashmont/Braintree platform to busway) is unavailable.


UNKNOWN_CAUSENone


Metrou Red Line
-

Alewife Escalator 353 (Main concourse to busway) is unavailable due to maintenance.


MAINTENANCENone


Metrou Red Line
-

Alewife Escalator 351 (Main concourse to platform) is unavailable due to maintenance.


MAINTENANCENone


Metrou Red Line
-

Forest Hills Pedal and Park is experiencing access issues and will be closed for repairs until further notice.


MAINTENANCEOTHER_EFFECT


Autobuz 31Autobuz 34EAutobuz 39Autobuz 51Autobuz 21Autobuz 35Autobuz 40Tren Franklin/Foxboro LineAutobuz 32Autobuz 36Autobuz 30Autobuz 33Autobuz 37Metrou Orange LineAutobuz 42Tren Needham LineAutobuz 34Autobuz 38Autobuz 50Autobuz 16
-

Route 558: Four stops have moved due to construction. Moved inbound stops: Commonwealth Ave @ Islington Rd & Commonwealth Ave opp Marriott. Moved outbound stops: Commonwealth Ave @ Islington Rd & Commonwealth Ave @ Marriott.


CONSTRUCTIONSTOP_MOVED


Autobuz 558
-

Woburn St @ Lowell St - Reading Sq stop has moved due to a safety issue with the nearby railroad crossings. Riders can board a bus at the Main St @ Lowell St stop (250 ft away) for inbound and outbound service.


UNKNOWN_CAUSESTOP_MOVED
Affected routes: <br>137

Autobuz 137
-

The Endicott Mini-high platform project has begun. Passengers and local residents can expect construction vehicles and activity during the day through the Winter of 2026.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Affected lines: <br>Franklin/Foxboro Line

Tren Franklin/Foxboro Line
-

Downtown Crossing Elevator 891 (Oak Grove platform to Franklin Street) is closed for maintenance. It is scheduled to return to service on September 22.


MAINTENANCENone
The elevator is closed for major equipment upgrades that will significantly improve the long-term reliability of this elevator. <br> <br>To exit: Travel down the Summer St concourse towards the Red Line. About halfway down the concourse, take a left through the set of glass doors marked 101 Arch St. Follow signs to the elevator. Take elevator to the 101 Arch St lobby and exit on Summer St. <br> <br>To board: Proceed to 101 Arch St on Summer St (across from Macy’s). Take elevator located in the rear-left corner of the lobby to Summer St concourse. At the concourse, turn right and follow signs to Oak Grove platform. <br>

Metrou Red Line
-

Downtown Crossing Elevator 870 (Ashmont/Braintree platform to Summer Street Concourse) is closed for maintenance. It is scheduled to return to service on September 22.


MAINTENANCENone
The elevator is be closed for major equipment upgrades that will significantly improve the long-term reliability of this elevator. <br> <br>To exit: Exit the train onto the center platform at Park Street Station. Travel to the south end of the platform and take Elevator 808 to the Winter St concourse, then elevator 804 to Winter St. <br> <br>To board: Take an Alewife train to Park Street Station (1 stop). Exit train onto the center platform. Transfer to an Ashmont or Braintree train.

Metrou Red Line
-

Park Street Elevator 812 (Green Line underpass to Government Center & North platform) is closed for maintenance. It is scheduled to return to service on September 22.


MAINTENANCENone
This elevator is closed for major equipment upgrades that will significantly improve its long-term reliability. <br> <br>To board a train to Copley and West: Follow signs to the Red Line and take Park Street Elevator 808 to the Red Line platform. Then use Park Street Elevator 979 to the Green Line Copley and West platform.

Tramvai DTramvai BTramvai ETramvai C
-

Park Street Elevator 823 (Green Line underpass to Copley & West platform) is closed for maintenance. It is scheduled to return to service on September 22.


MAINTENANCENone
This elevator is closed for major equipment upgrades that will significantly improve its long-term reliability. <br> <br>To board a northbound train: Proceed to the end of the platform and take Park Street Elevator 979 to the Red Line. At the end of the Red Line platform, use Elevator 808 to access the Winter St concourse and Green Line northbound platform.

Tramvai DTramvai BTramvai ETramvai C
-

The Stoughton mini-high platform is out of service until further notice. For passengers with accessibility needs, please use the portable lift.


UNKNOWN_CAUSENone


Tren Providence/Stoughton Line
-

Select areas of the Anderson/Woburn MBTA Daily Lot and Gated Overnight Lot will be temporarily closed for major paving and infrastructure improvement work.


UNKNOWN_CAUSEOTHER_EFFECT
Beginning July 13, 2026, the Woburn Anderson Regional Transportation Center will undergo a major paving and infrastructure improvement project, with work expected to be completed by November 16, 2026. <br> <br>To support these critical renovations and enhance the long-term safety and functionality of the facility, select areas of the MBTA Daily Lot and the gated Overnight Lot will be temporarily closed throughout the construction period. <br> <br>Motorists and facility users are encouraged to plan accordingly and carefully follow all posted signage, traffic control measures, and parking restrictions to ensure a safe and efficient experience during the project.

Tren Lowell Line
-

The Wyoming Hill Mini-high platform project has begun. Passengers and local residents can expect construction vehicles and activity during the day through the Winter of 2026.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Affected lines: <br>Haverhill Line

Tren Haverhill Line
-

American Legion Hwy @ Revere St is closed due to construction. For Routes 426 and 450, the closest stop with service is American Legion Hwy @ Hutchinson St. For Routes 424 and 455, the closest stop with service is Revere St @ Stowers St.


CONSTRUCTIONNO_SERVICE
Affected routes: <br>424 <br>426 <br>450 <br>455

Autobuz 426Autobuz 450Autobuz 424Autobuz 455
-

Route 220 detoured due to construction. The closest stops with inbound service are 319 Lincoln St & Lincoln St opp Lincoln Plaza. The closest stops with outbound service are Lincoln St @ Lincoln Plaza & 322 Lincoln St.


CONSTRUCTIONDETOUR
Skipped outbound stops: <br>Hingham Shipyard @ Ferry Terminal <br> <br>Skipped inbound stops: <br>Hingham Shipyard @ Ferry Terminal

Autobuz 220
-

Worcester Elevator 782 (Parking lot to pedestrian bridge) is unavailable. Please use elevator in main building at 2 Washington Sq.


UNKNOWN_CAUSENone


Tren Framingham/Worcester Line
-

South Station Escalator 388 (Lobby to CSA area) is unavailable due to maintenance.


MAINTENANCENone


Metrou Red LineAutobuz SL3Autobuz SL2Autobuz SL1
-

McGrath Hwy @ Poplar St (outbound) has been temporarily relocated to the front of the Mercedes Benz dealership due to construction.


CONSTRUCTIONSTOP_MOVED
Affected routes: <br>80 <br>87 <br>88

Autobuz 80Autobuz 87Autobuz 88
-

Courthouse Escalator 418 (Lobby to Seaport Boulevard, Fan Pier Boulevard) is unavailable due to maintenance.


MAINTENANCENone


Autobuz SL3Autobuz SL2Autobuz SL1
-

Green St @ Magazine St stop is closed through Friday, Aug 28, due to construction. Riders can board at Western Ave @ Green St.


CONSTRUCTIONNO_SERVICE
Affected routes: <br>70

Autobuz 70
-

Green Line C Branch: Trains are not stopping at Brandon Hall through October 4 while accessibility upgrades are being done. Riders can board or alight at either Fairbanks St or Summit Ave, which are 0.1-0.2 miles away (or a 4- to 5-minute walk)


UNKNOWN_CAUSENO_SERVICE


Tramvai C
-

On Tue, Aug 18 and Wed, Aug 19, from 7 AM to 3 PM, Mass Ave @ Huntington Ave (inbound) will be closed due to tree maintenance. Please board the Rt. 1 bus at Mass Ave opp Christian Science Ctr (inbound) or Mass Ave @ Mass Ave Station (inbound).


MAINTENANCENO_SERVICE
Affected routes: <br>1

Autobuz 1
-

Porter Escalator 510 (Ashmont/Braintree platform to paid lobby) is unavailable due to maintenance.


MAINTENANCENone


Metrou Red Line
-

Green Line E Branch: Symphony station is closed for major accessibility upgrades. Riders can use Prudential or Northeastern to access E Branch service. The station is expected to reopen in 2029.


UNKNOWN_CAUSENO_SERVICE
Alternate Service Options: <br>• Riders who typically board or disembark at Symphony can instead board or disembark at Northeastern University or Prudential, which are 0.3 miles away (or about a five-minute walk) from Symphony. <br> <br>• Riders are encouraged to instead consider travelling on the Orange Line at Massachusetts Avenue, which is 0.1 miles (or about a three-minute walk) from Symphony. <br> <br>• Riders may also use the Route 39, which operates parallel to the E branch in both directions along Huntington Avenue. <br> <br>Background: <br>Currently, there are no step-free pathways from the entrances to the platforms at Symphony, and the station is not able to be accessed by people with wheeled mobility devices. When construction is complete in spring 2029, Symphony will be enhanced with four new accessible elevators, raised platforms for easier boarding, accessible bathrooms, improved wayfinding, more lighting, and upgraded safety features, making the station safer and easier to use for all riders.

Tramvai E
-

Concord Ave @ Chauncy St (outbound) will be closed due to construction on Tuesday, August 11, through Tuesday, August 25. Please board Route 74, 75, and 78 buses from Concord Ave opp Craigie St (outbound).


CONSTRUCTIONNO_SERVICE
Affected routes: <br>74 <br>75 <br>78

Autobuz 75Autobuz 74Autobuz 78
-

Chinatown Elevator 876 (Oak Grove platform to Washington St, Essex St) is unavailable due to maintenance.


MAINTENANCENone
To exit, exit the train at Tufts Medical Center and proceed to the Washington St exit. At street level, cross Washington St, then take a Silver Line SL4 or SL5 bus to Washington St and Essex St (Chinatown Station). Alternatively, if possible, travel 0.2 miles north on Washington St to Chinatown Station. To board, use Chinatown Elevator 922 to access the Forest Hills platform. Take a Forest Hills-bound train to Tufts Medical Center transfer to an Oak Grove-bound train.

Metrou Orange Line
-

Washington St @ Prospect St (inbound) and Washington St @ Prospect St (outbound) will be moving beginning Tue, Aug 18 due to construction. Riders can use the bus stop at Washington St @ Auburn St during this work.


CONSTRUCTIONSTOP_MOVED
Affected routes: <br>505

Autobuz 505
-

Forest Hills Escalator 129 (Orange Line platform to upper lobby) is unavailable due to maintenance.


MAINTENANCENone


Metrou Orange Line
-

Harvard Escalator 513 (Harvard Square to mezzanine) is unavailable due to maintenance.


MAINTENANCENone


Autobuz 109Metrou Red LineAutobuz 75Autobuz 74Autobuz 73Autobuz 86Autobuz 78Autobuz 96Autobuz 71Autobuz 77Autobuz 66
-

State Escalator 523 (Forest Hills platform to Washington Street, Milk Street) is unavailable due to maintenance.


MAINTENANCENone


Metrou Orange LineMetrou Blue Line
-

Washington St @ Washington Terr (inbound) and Washington St @ Merriam St (outbound) are permanently closed due to construction. The closest inbound stop is Washington St @ Boston St. The closest outbound stop is Washington St @ Medford St.


CONSTRUCTIONNO_SERVICE
Affected routes: <br>85 <br>91 <br>109

Autobuz 91Autobuz 109Autobuz 85
-

Route 121 detoured Mon through Fri from 7 AM to 5 PM until Fri, Sep 11 due to construction. Closest inbound stops are Bennington St @ Chelsea St & Meridian St @ Liverpool St. Closest outbound stops are Meridian St @ Havre St & Bennington St @ Neptune Rd.


CONSTRUCTIONDETOUR
Skipped outbound stops: <br>Meridian St @ Saratoga St <br>Lexington St @ Marion St <br>Lexington St @ Brooks St <br>Lexington St @ Putnam St <br>Lexington St @ Prescott St <br>Lexington St @ Shelby St <br>E Eagle St @ Chelsea St <br> <br>Skipped inbound stops: <br>Eagle St @ Lexington St <br>Lexington St @ Prescott St <br>Lexington St @ Putnam St <br>Lexington St @ Brooks St <br>Lexington St @ Marion St <br>Lexington St @ Meridian St

Autobuz 121
-

Route 47 detoured inbound through Friday, August 28 due to construction. Service will originate at Green St @ Pearl St.


CONSTRUCTIONDETOUR
Skipped inbound stops: <br>Green St @ Magazine St

Autobuz 47
-

Hingham/Hull Ferry: Due to a vessel substitution, some trips on the Hingham/Hull Ferry route will depart from an alternate location at Long Wharf (North). Some trips are subject to a 10 minute delay. Ferry personnel will be available to provide guidance.


UNKNOWN_CAUSEOTHER_EFFECT


Aquabus Hingham/Hull FerryAquabus Hingham Ferry
-

Davis Elevator 817 (Lobby to College Avenue) is unavailable due to maintenance.


MAINTENANCENone
A shuttle bus will be available to transport customers between Harvard and Davis. To exit, exit the train at Harvard and find station personnel or use a station call box to request the shuttle bus to Davis. To board, find station personnel or use a station call box at Davis to request the shuttle bus to Harvard. Alternatively, customers may also use the Route 96 bus for transportation between Harvard and Davis.

Metrou Red Line
-

Maverick Escalator 428 (Unpaid lobby to Lewis Mall) is unavailable due to maintenance.


MAINTENANCENone


Metrou Blue Line
-

Worcester Line Train 510 (5:45 AM from Worcester) is operating 5-15 minutes behind schedule between Framingham and South Station.


UNKNOWN_CAUSEOTHER_EFFECT
Affected stations: <br>Framingham <br>West Natick <br>Boston Landing <br>Lansdowne <br>Back Bay <br>South Station

Tren Framingham/Worcester Line
-

Route 65 is experiencing delays of about 20 minutes due to traffic.


OTHER_CAUSEOTHER_EFFECT


Autobuz 65
-

Route 104 is experiencing delays of about 20 minutes due to traffic.


OTHER_CAUSEOTHER_EFFECT


Autobuz 104
-

Framingham Line Train 1511 (6:13 AM from South Station) is operating 5-15 minutes behind schedule between Wellesley Square and Framingham due to train traffic.


UNKNOWN_CAUSEOTHER_EFFECT
Affected stations: <br>Wellesley Square <br>Natick Center <br>West Natick <br>Framingham

Tren Framingham/Worcester Line
-

Framingham Line Train 1516 (7:21 AM from Framingham) has departed Framingham and is operating 10-20 minutes behind schedule.


UNKNOWN_CAUSEOTHER_EFFECT


Tren Framingham/Worcester Line
-

Providence Line Train 813 (6:35 AM from South Station) is operating 5-15 minutes behind schedule between Attleboro and Wickford Junction.


UNKNOWN_CAUSEOTHER_EFFECT
Affected stations: <br>Attleboro <br>Pawtucket/Central Falls <br>Providence <br>TF Green Airport <br>Wickford Junction

Tren Providence/Stoughton Line
-

Route 112 is experiencing delays of about 20 minutes due to traffic.


OTHER_CAUSEOTHER_EFFECT


Autobuz 112
-

Route 108 is experiencing delays of about 20 minutes due to traffic.


OTHER_CAUSEOTHER_EFFECT


Autobuz 108
-

Haverhill Line Train 218 (7:25 AM from Haverhill) is operating 5-15 minutes behind schedule between Lawrence and North Station due to a signal issue.


UNKNOWN_CAUSEOTHER_EFFECT
Affected stations: <br>Lawrence <br>Andover <br>Ballardvale <br>North Station

Tren Haverhill Line
-

Route 45 outbound is detoured. The closest stops with service are Blue Hill Ave @ Maywood St and Blue Hill Ave @ Wayne St.


UNKNOWN_CAUSEDETOUR
Skipped outbound stops: <br>Blue Hill Ave @ Quincy St <br>Blue Hill Ave @ Gaston St <br>Blue Hill Ave @ Brunswick St <br>Blue Hill Ave @ Stanwood St

Autobuz 45
OK

pentru a lăsa un comentariu, treceți prin înregistrare

pentru a introduce numerele este necesară înregistrare


timprute